Removed circa 1940 500-gallon solvent underground storage tanks from the site. Completed soil, vapor intrusion, indoor air risk assessment, and groundwater investigation at the site. Designed an augmented bio-remediation pilot test for using emulsified oil, ZVI and Bac-9 culture to treat contaminated groundwater.